Contained in the crumbling, leaky century-old tunnel on the middle of a struggle between Amtrak and MTAMay 16, 20250 Ninety ft under the East River, Amtrak’s 110 year-old prepare tunnels are slowly filling with salty water dripping on high-voltage…